50kW Plant
In 1999 the first test plant was constructed yielding 50kW. This plant proved the concept of the Low Temperature Circulating Fluidized Bed (LT-CFB) by producing syngas without corrosive inorganics from high alkaline wheat straw and animal manure. Test results from this plant laid a foundation for up-scaling.
50kW LT-CFB demonstration plant