Images - March 2009
The first turbine at Horns Rev 2 is ready for installation. 
The turbine blades are lifted off the vessel Sea Power.

TV2 News came by with their TV helicopter. The turbine installation was shown on national TV the same evening.
Turbine G3 is almost in place. 
The first turbine has been erected - Thursday 19 March